The project consisted of the construction of an energy development comprising: 3 mini hydroelectric power plants with a total capacity of 102 MW, capable of supplying 200,000 homes. On the other hand, a solar plant of 1.14 MW designed to supply the construction site. A 56 km transmission line and finally a collection substation.