SUPERVISION: "SANTA CRUZ - WARNES DUAL CARRIAGEWAY CONSTRUCTION PROJECT (EAST SIDE)"

Location: Santa Cruz-Warnes, BOLIVIA

Client: ADMINISTRADORA BOLIVIANA DE CARRETERAS

Development: 2017-2021

Description of the project:

ABC with external Financing from the Development Bank for Latin America (CAF), local contributions from the Departmental Government of Santa Cruz and the Municipalities of Santa Cruz de la Sierra and Warnes, has undertaken the Construction of the New Santa Cruz – Warnes Dual Carriageway Project (East Side). The road will be part of the Fundamental Road Network of Bolivia F-04, whose objective is to have a road with optimal characteristics to relieve the currently saturated Santa Cruz – Warnes double road, integrating the populations located within the area of influence. The new dual carriageway is 27.6 km long from start to finish, has a double carriageway of rigid pavement (e=24 cm), a design speed of 100 km/h, each carriageway is 10.5 m wide and has three lanes in each direction. Regarding the total number of major structures, it contemplates 7 viaducts at the intersections with the railroad, 1 viaduct at the intersection with the existing SCZ-Warnes road and 2 bridges.

 

GHENOVA scope of works:

The GHENOVA-IA Fiscalization represents ABC in the Work, carrying out the control, monitoring for the faithful compliance of the activities of the Technical and Environmental Supervision, in turn overseeing the Construction works of the Work until its satisfactory conclusion.