ENERGY, INDUSTRY AND WATER/ENERGY RECOVERY
KEBAG ENOVA EMMENSPITZ
BRIEF PROJECT DESCRIPTION
This new plant has two combustion lines that will be used to process 221.000 tons of separated municipal and commercial waste.
Details
of the project
Name: Kebag Enova Emmenspitz
Client: HZ INOVA End client: KEBA
Location: Zuchwil, Canton of Solothurm, SWITZERLAND
Year of development: 2020-2021
Narrative description of the project
A new waste-to-energy plant, called KEBAG Enova Emmenspitz, will be built in Zuchwil, Canton of Solothurn, Switzerland. This new plant has two combustion lines that will be used to process 221.000 tons of source-separated municipal and commercial waste per year to generate up to 53,7 MW of thermal energy, which will be fed into the grid as electricity or district heating.
Scope of Ghenova's work
Detailed engineering of the structure.
GHENOVA is responsible for the engineering and design of the steel structure for the combustion and boiler area:
– Engineering: Structural calculation including optimization of steel structure profiles, detailed calculation of all connections, calculation of temporary works, engineering drawings and floor covering drawings.
– Workshop documentation: Drawings of individual parts and assembly/delivery units, bills of materials, NC files and Excel list for the LMS data system.
– Assembly documentation: Assembly drawings, cube drawings, lifting unit (LU) drawings and bills of materials.
GHENOVA is responsible for the engineering and design of the steel structure for the combustion and boiler area:
– Engineering: Structural calculation including optimization of steel structure profiles, detailed calculation of all connections, calculation of temporary works, engineering drawings and floor covering drawings.
– Workshop documentation: Drawings of individual parts and assembly/delivery units, bills of materials, NC files and Excel list for the LMS data system.
– Assembly documentation: Assembly drawings, cube drawings, lifting unit (LU) drawings and bills of materials.