SPHERE PRINCESS (C-6310)
Location: ITALY
Client: Fincantieri Monfalcone
Final Client: Princess Cruises
Development: 2021-2022
Vessel Type: Cruise
Number of passengers: 4.300
Number of cabins: 1.465
Narrative description of the project:
The vessels will accommodate approximately 4,300 guests and will be based on a next-generation platform design, being the first Princess Cruises’ ships to be dual-fuel powered primarily by Liquefied Natural Gas (LNG)
GHENOVA scope of works:
Functional and Detailed Engineering
Functional engineering of Mechanical Plants
- Balances, Process Flow Diagram & correlated activities
- Piping and Instrumentation Drawings (P&ID) & correlated activities
- Procurement of machineries and accessories
Functional engineering of “Classification Drawings”
- Definition for the structural functional plan and including structural analysis and interface checks.
- Calculation and Steel Drawings for Class Society Approval
Detail engineering
- Hull and Outfitting detail design ACCOMODATION AREA, Main Vertical Zone 2 and 3
- Coordination of Piping, HVAC ducts, cable trays and steel outfitting with iso drawings, arrangement drawings and MTO, including industrialization