AHUMADAS I, III, IV & V Photovoltaic plants

Location: Chihuahua, MEXICO

Client: BESTER

Development: 2018

Power output: 144 MW

Narrative description of the project:

Solar energy has become one of the key methods in power generation worldwide, trying to promote the use of environmentally friendly technologies.

The implementation of photovoltaic panels, manufactured with components that generate chemical reactions, allows the absorption of solar radiation and allows the transformation of the energy produced by that radiation into electric current. Thus, this photovoltaic park generates 144 MW of usable energy.


GHENOVA Scope:
Detailed Engineering.

Preparation of Detailed Engineering, in the Civil and Electrical disciplines, for the four photovoltaic plants.