LEONARDO (C-6298)

Location: ITALY

Client: Fincantieri Marghera

Final Client:  Norwegian Cruise Line

Development: 2019-2021

Vessel Type: Cruise

Number of passengers: 4.012

Number of cabins: 1.646

Narrative description of the project:

The company’s four next generation ships are scheduled for delivery in 2022, 2023, 2024 and 2025. If NCL exercises the contract option, the two additional cruise ships would be handed over to their owner in 2026 and 2027. The new class of ships will build upon the brand’s most recent Breakaway-Plus Class ships. A priority of the prototype design is energy efficiency, with the aim of optimizing fuel consumption and reducing the impact on the environment, according to the cruise company.

GHENOVA scope of works:

Functional and Detailed Engineering

Functional engineering of “Classification Drawings”

  • Revision, control and updating of class drawings in line with production stage
  • Calculations and Steel drawings

Detail engineering

  • Coordination of Piping, HVAC ducts, cable trays and steel outfitting with iso drawings, arrangement drawings and MTO, including industrialization in Main Vertical Zones 3 and 4
  • Revision, control and updating of cable trays 3D model