NAVAL, SECURITY AND DEFENSE
OPS PROJECT IN PASSENGER TERMINALS. PORT MÁLAGA
BRIEF DESCRIPTION OF THE PROJECT
Ghenova has been awarded the contract for the drafting service of the preliminary or basic project for the construction of a substation in the Port of Malaga and the implementation of OPS systems.

Details
of the project
Name: Ports-OPS Malaga
Client: Port of Malaga
Location: Spain
Narrative description of the project
Ghenova has been awarded the contract for the drafting service of the preliminary project or basic project for the construction of a substation in the Port of Malaga and the implementation of OPS (On-Shore Power Supply) systems for energy supply to ships in port (Cold Ironing) that contribute to the decarbonization of the Port of Malaga. The project has an execution period of 3 months.
Scope of Ghenova's work
STARTING POINT (PHASE 0):
– Compilation of available information and verification of starting points.
– Analysis and diagnosis of the current situation.
ELECTRICAL SUBSTATION (PHASE 1):
– Connection line and connection point with the utility company.
– 66 kV/ 20 kV transformer substation of new construction.
OPS SHIP SUPPLY SYSTEM (PHASE 2):
– Proposals and study of alternatives
– Comparative analysis of the solutions.
– OPS ship supply system.
– Compilation of available information and verification of starting points.
– Analysis and diagnosis of the current situation.
ELECTRICAL SUBSTATION (PHASE 1):
– Connection line and connection point with the utility company.
– 66 kV/ 20 kV transformer substation of new construction.
OPS SHIP SUPPLY SYSTEM (PHASE 2):
– Proposals and study of alternatives
– Comparative analysis of the solutions.
– OPS ship supply system.