FRAGATAS F110
BRIEF DESCRIPTION OF THE PROJECT
The future F110 frigates are one of the Navy’s star programs pending modernization over the next few years.
Details
of the project
Name: F110 Frigates
Client: Navantia
Location: Spain
Year of development: 2020-in development
Narrative description of the project
These will be in charge of replacing the current F80s of the Santa Maria class, a group of vessels whose first unit entered service in 1986 and which are gradually reaching the end of their operational life, which would be around 2025, after the modernization they received in the early 2000s. Five units will be built with an estimated program value of €4.3 billion. Construction is scheduled to begin in February 2022 at the Navantia shipyard in Ferrol.
Scope of Ghenova's work
Development of the basic project. Complementary tasks.
Technical assistance basic structural design
Basic design of equipment area.
Basic design of mechanical systems area: propulsion and auxiliary systems.
Basic design of electronic/combat systems area: navigation, communications, radar, countermeasures, submarine warfare and weapons.
Basic design of the habilitation area.
ILS Engineering to CDR (Critical Design Review)
Detailed engineering, all disciplines, zones 1, 2, 3, 4, 6, 7, 8 and 9.
Digital Twin.
Systems Integration Support.
Technical assistance basic structural design
Basic design of equipment area.
Basic design of mechanical systems area: propulsion and auxiliary systems.
Basic design of electronic/combat systems area: navigation, communications, radar, countermeasures, submarine warfare and weapons.
Basic design of the habilitation area.
ILS Engineering to CDR (Critical Design Review)
Detailed engineering, all disciplines, zones 1, 2, 3, 4, 6, 7, 8 and 9.
Digital Twin.
Systems Integration Support.