The UTE RIOGRANDE NEW LOC – Natural Gas Combined Cycle Plant (the Plant) is projected with a net power of 1,238 MW, to be installed at Fazenda Sao Francisco.
Proyecto Ute Rio Grande

Details
of the project

Name: Ute Rio Grande – Combined Cycle
Client: GLOBELEQ-SASOL-EDM
Location: Temane, Inhambane, MOZAMBIQUE
Year of development: 2021-2022

Narrative description of the project

The UTE RIOGRANDE NEW LOC – Natural Gas Combined Cycle Plant (the Plant) is projected with a net power of 1,238 MW, to be installed at Fazenda Sao Francisco, in Jabequara, in the state of Bahia. The plant will be interconnected to the National Interconnected System (SIN) through a double circuit XXX kV (60 Hz) transmission line to the Camaraçi II and Camaraçi IV substations, with an approximate length of 25 km. The final configuration of the Power Island is 2 x 2 x 1 (two (2) gas turbines, two (2) HRSGs and one (1) steam turbine).

Scope of Ghenova's work