SIMAN in the aeronautical sector
Implementation of SIMAN in the HLA aircraft maintenance company.
SIMAN in the aeronautical sector Read More »
Implementation of SIMAN in the HLA aircraft maintenance company.
SIMAN in the aeronautical sector Read More »
Implementation of SIMAN in MURUETA’s fleet.
SIMAN in MURUETA’s fleet Read More »
Implementation of SIMAN in the MURELOIL fleet.
SIMAN in the MURELOIL fleet Read More »
Implementation of SIMAN on CSIC oceanographic vessels IEO
SIMAN in the CSIC-IEO fleet Read More »
In 2023, the implementation of SIMAN began on the 11 new ADUANAS vessels built by RODMAN shipyards.
SIMAN in 8 high-speed patrol boats and 3 offshore patrol boats. Read More »
SASEMAR has been relying on SIMAN for more than a decade for fleet asset configuration, maintenance management and inventory control.
SIMAN in the SASEMAR fleet Read More »
Ghenova has been awarded the contract to draft the preliminary or basic project for the construction of a substation in the Port of Malaga and to implement OPS (On-Shore Power Supply) systems.
OPS PROJECT IN PASSENGER TERMINALS. PORT MÁLAGA Read More »
During the year 2022 Ghenova carried out the study and drafting of two preliminary projects for the installation of electrical supply (OPS) to ships in the passenger terminals of Baleària and Trasmed.
OPS PUERTO VALENCIA PROJECT Read More »
The shipbuilding industry seeks to increase productivity in small and medium-sized shipyards with controlled investments, through automation and digitalization, while respecting sustainability and labor safety.
The Wikinger wind farm in the waters of the Baltic Sea, Germany, represented the group’s first stand-alone offshore wind project with an investment of approximately EUR 1.4 billion. With an output of 350 MW, its construction was a significant challenge.