BELGRADE

BRIEF DESCRIPTION OF THE PROJECT
The cogeneration plant will have an installed capacity of 56 MWth and 25 MWe to treat 340,000 tons of municipal waste per year, equivalent to about 66% of the total waste.
Proyecto BELGRADE Plant CHP

Details
of the project

Name: Belgrade
Client: CNIM
Location: Vinča, SERBIA
Year of development: 2020-2021

Narrative description of the project

Belgrade’s Vinča waste-to-energy (WtE) project in Belgrade will provide the Serbian capital’s 1.7 million inhabitants with a modern waste management system. The cogeneration plant will have an installed capacity of 56 MWth and 25 MWe to treat 340,000 tons of municipal waste per year, which is equivalent to about 66% of the total municipal waste generated in Belgrade. There is a heat purchase agreement with Beoelektrane and a power purchase agreement with EPS Snabdevanje. The new landfill will comply with EU standards and will be equipped with modern waste management and treatment technology. The replacement of the existing landfill will also address a major environmental and health risk, namely the pollution of the nearby Danube River.

Scope of Ghenova's work

Detailed piping design.

Detailed piping design for support boiler, detailed piping design for water, steam, gas and utilities, including 3D model, the purpose of which is the issuance of isometric books, bill of materials, support book, control book and general layouts.