SOUTHERN THERMOELECTRIC COMBINED CYCLE POWER PLANT

BRIEF DESCRIPTION OF THE PROJECT
The project consists of a cycle closure of these two 2GT/module modules with 2HRSG+1ST per module and adding 2 modules of 2GT+1ST+2HRSG, obtaining a power of 373 Mwe.
Proyecto termoelectica del sur

Details
of the project

Name: Termoeléctrica del Sur
Client: TSK-SIEMENS
Location: Yaguacua, Yacuíba, BOLIVIA
Year of development: 2016-2019

Narrative description of the project

The existing South Thermoelectric Plant supplies power and electric energy to the National Interconnected System (SIN) through four SGT-800 turbines, SIEMES brand, (40 MW each), a 230 KV elevator substation and an estimated gas consumption of 40 MMpcd. The project consists of a cycle closure of these two 2GT/module modules with 2HRSG+1ST per module and adding 2 modules of 2GT+1ST+2HRSG, obtaining a power of 373 Mwe.

Scope of Ghenova's work

Scope of GHENOVA’s work:

Detail Engineering, Civil, Piping and Integration Disciplines.

– Detailed engineering of civil, piping and integration disciplines.
– Water treatment engineering included in the scope.