WARNES THERMOELECTRIC PLANT

BRIEF DESCRIPTION OF THE PROJECT
The project consists of a cycle closure of these two modules of 2.5GT/module with 2HRSG+1ST per module and adding 2 modules of a 2GT+1ST+2HRSG, obtaining a power of 373 Mwe.
Proyecto WARNES II CONVENCIONAL

Details
of the project

Name: Warnes Combined Cycle Plant
Client: TSK-SIEMENS
Location: Meat, Santa Cruz, BOLIVIA
Year of development: 2016-2019

Narrative description of the project

The current Warnes Thermoelectric Plant supplies power and electric energy to the National Interconnected System (SIN) through five SGT-800 turbines, SIEMES brand, (40 MW each), a 230 KV elevator substation and an estimated gas consumption of 40 MMpcd. The project consists of a cycle closure of these two modules of 2.5GT/module with 2HRSG+1ST per module and adding 2 modules of a 2GT+1ST+2HRSG, obtaining a power of 373 Mwe. Dry cooling technology used.

Scope of Ghenova's work